PLACE: SAN JOSÉ DEL CABO, BCS.

WE CARRY OUT ELECTRICAL WORKS IN THE PROPERTY KNOWN AS LA BALLENA.

WE BUILT THE OVERHEAD LINE IN WHICH BETWEEN NEW AND EXISTING WORKS WERE INSTALLED MORE THAN 300 STRUCTURES ON POLES, MORE THAN 100 TRANSFORMERS AND 25KM OF CONDUCTOR TO ELECTRIFY AND REGULATE ENERGY IN THIS AREA OF SAN JOSÉ DEL CABO.