15 June, 2022

MEXICALI LINE

15 June, 2022

PLACE: MEXICALI, BC.

WE BUILT A MEDIUM VOLTAGE LINE FOR THE MXI-5110 CIRCUIT SUBSTATION MEXICALI. A NEW OVERHEAD LINE TRUNK WAS DERIVED FROM THE SUBSTATION TO BE INTERCONNECTED TO THE CITY NETWORK, WHICH CONSISTED OF 28 POSTS AND 3 KM OF CONDUCTOR TO FORM PART OF THE 5110 CIRCUIT OF SAID SUBSTATION.

RECIENTES PUBLICACIONES

18 June, 2022

 INDUSTRIAL WAREHOUSE MAINTENANCE

18 June, 2022

EL FLORIDO SUBSTATION

18 June, 2022

PENINSULA SQUARE

© NEZCO. Todos los Derechos Reservados.